top of page

 

Investment: WIKTORIA PORT

Location: STEPNICA

Start: IV.2015
End: IX.2015


Construction of the grain elevator WIKTORIA PORT in Stepnica with an area of 2 160 m2 and a capacity of 17 280 m3. The construction of reinforced concrete walls, the roof in wooden construction.

A reinforced concrete technological channel was built under the hall.

 

GENERAL CONTRACTOR - TURNKEY REALIZATION

bottom of page